1. Civil Engineering Practical Knowledge
Civil engineering practical knowledge ensures structural integrity and compliance with Indian Standards:
- Weight of First-Class Brick: A first-class brick weighs at least 3.85 kg (IS 1077).
- Tensile Strength of Brick: First-class bricks have a tensile strength of at least 3000 lbs/in² (20.7 MPa, IS 1077).
- Hook Length: Hooks in reinforcement bars must be at least 9D (9 times bar diameter) (IS 456:2000).
- Water Absorption of Brick: First-class bricks absorb no more than 1/5 to 1/6 of their weight in water (IS 1077).
- Building Height: Standard building height is 315 cm (3.15 m).
- Riser Height: Stair risers should be 15 cm (IS 1237).
- Lintel Thickness: Lintels require a minimum thickness of 15 cm (IS 456:2000).
- Fineness Modulus of Sand: Sand (normal/local) should have a fineness modulus of 0.5-0.8 (IS 383).
- Window Height: Recommended window height is 120 cm.
- DPC Thickness: Damp Proof Course (DPC) must be at least 2.5 cm thick (IS 2212).
2. Basic Knowledge of Building Construction
Building construction principles ensure structural safety (IS 456:2000):
- Cantilever Anchorage: Cantilever bars need an anchorage length of 69D (IS 456:2000).
- Column Bend Length: Minimum bend length for column reinforcement is 300 mm.
- Chair Bar Diameter: Minimum diameter for chair bars is 12 mm.
- Dowel Bar Diameter: Minimum diameter for dowel bars is 12 mm.
- Lapping Length: Lapping is not allowed for bars >36 mm (IS 456:2000).
- Column Reinforcement: Square columns need at least 4 bars; circular columns need 6 bars.
- Longitudinal Reinforcement: Should be 0.8%-6% of the gross cross-sectional area.
- Slab Reinforcement: Main bars in slabs should be ≥8 mm (HYSD) or ≥10 mm (plain); distribution bars ≥8 mm and ≤1/8 slab thickness.
- Reinforcement Quality: All reinforcement must be free from mill scales, rust, paint, or oil (IS 456:2000).
3. Site Engineer Basic Knowledge
Site engineers must understand key standards:
- Dead Load: Self-weight of the structure (e.g., slabs, beams, columns) (IS 875).
- Damp Proof Course (DPC): A 2.5 cm thick layer of waterproof material prevents moisture ingress (IS 2212).
- Sand Moisture Content: Sand with >5% moisture is unsuitable for concrete mixing (IS 383).
- RCC Curing Period: Reinforced Cement Concrete (RCC) requires 28 days for full strength (IS 456:2000).
- Ties and Stirrups: Ties in columns and stirrups in beams resist shear.
- M20 Concrete: Used for slabs with a mix ratio of 1:1.5:3 (cement:sand:aggregate, IS 456:2000).
- Hook Length: Minimum 9D for reinforcement hooks.
- Unit Weights: PCC: 24 kN/m³; RCC: 25 kN/m³; steel: 7850 kg/m³.
- Cement Age: Cement >3 months old loses strength (IS 1489).
- Brick Size: Standard brick size is 19x9x4 cm (IS 1077).
4. Basic Building Planning
Building planning ensures functionality and safety:
- Floor Height: Standard floor height is 3 m (10 ft).
- Slab Thickness: Minimum slab thickness is 0.125 m (125 mm) (IS 456:2000).
- Sill Level: Minimum sill level height is 44 inches (1.12 m).
- Cantilever Beam: Fixed at one end, used for balconies.
- Simply Supported Beam: Requires at least two supports.
- PCC Usage: Plain Cement Concrete (PCC) is used where no tensile forces act.
- RMC: Ready Mix Concrete (RMC) is factory-made for large projects.
5. Useful Tips for Civil Engineers
Key tips for civil engineers:
| Parameter | Requirement |
|---|---|
| Lapping of Bars | Not allowed for bars >36 mm (IS 456:2000) |
| Circular RCC Column | Minimum 6 longitudinal bars |
| Slab Thickness | Minimum 0.125 m |
| Water pH | >6 for construction (IS 456:2000) |
| Brick Compressive Strength | 3.5 N/mm² (IS 1077) |
| Dead Load | Self-weight of structure |
| Sand Moisture Content | ≤5% for concrete mix |
| DPC Thickness | ≥2.5 cm (IS 2212) |
| RMC | Factory-made for large projects |
| Thermal Expansion | 12x10^-6/°C for concrete and steel |
| Bricks per m³ | 550 for masonry |
| Specific Gravity | Cement: 3.16 g/cm³; Brick: 2 g/cm³; Sand: 2 g/cm³ |
| Volume of 50 kg Cement Bag | 1.3 cft |
| TMT Bars | Thermo-mechanically treated, 12 m length |
6. Percentage of Waste Factor in Building Materials
Waste factors account for material loss:
| Material | Waste Factor (%) |
|---|---|
| Cement | 2-5 |
| Sand | 5-10 |
| Aggregate | 5-7 |
| Bricks | 5-10 |
| Steel | 7-10 |
7. Construction Materials
Construction materials are the backbone of projects:
- Cement: Produced by crushing limestone and clay. Types include OPC, PPC (IS 1489).
- Fine Aggregate: Passes through a 4.75 mm sieve, retained on 0.075 mm (sand, IS 383).
- Coarse Aggregate: Retained on a 4.75 mm sieve (gravel).
- Concrete: Mix of cement, aggregate, and water. Strength (e.g., M25) indicates 25 N/mm² at 28 days.
- Setting Times: Initial setting: ~30 minutes; final setting: ~10 hours (Vicat apparatus, IS 4031).
- Admixtures: Retarders slow setting; accelerators speed it up.
8. Components of Building
Key building components:
- Foundation: Transfers load to the ground (e.g., raft, pile, IS 2911).
- Columns: Vertical load-bearing members.
- Beams: Horizontal members resisting bending.
- Slabs: Flat surfaces for floors/roofs.
- Walls: Enclose spaces, using bricks or blocks (IS 2212).
- Roof: Protects against weather, often RCC.
9. Minimum Design Requirements for Staircase
Staircase design ensures safety (IS 1237):
- Headroom: Minimum 2 m above treads/landings.
- Stair Width: Minimum 900 mm.
- Handrails: 900-1100 mm high on both sides.
- Riser: 150-200 mm height.
- Tread: 250-300 mm depth.
- Slope/Pitch: 25-40 degrees.
- Balustrades: ≥900 mm high on open sides.
- Lighting: Switches at top/bottom.
- Non-Slip Surface: Prevents accidents.
- Structural Support: Designed for intended load.
- Fire Safety: Use fire-resistant materials (NBC 2016).
10. Thumb Rule for Manpower Productivity
Manpower productivity estimates:
| Activity | Productivity (per day) |
|---|---|
| Brickwork | 1.25 m³/mason |
| Plastering | 10 m²/plasterer |
| Concrete Pouring | 3-5 m³/worker |
| Formwork | 8-10 m²/carpenter |
| Reinforcement | 100-150 kg/bar bender |
11. Strengthening Techniques for RC Columns
Strengthening RC columns:
- Concrete Jacketing: Adding a concrete layer with extra reinforcement.
- Steel Jacketing: Wrapping with steel plates.
- FRP Wrapping: Using fiber-reinforced polymers.
- Section Enlargement: Increasing column size with RCC.
12. Slump Value for Concrete Constructions
Slump values measure concrete workability (IS 1199):
| Construction Type | Slump (mm) |
|---|---|
| PCC | 25-50 |
| RCC Slabs | 50-100 |
| Columns, Beams | 75-150 |
| Pumped Concrete | 100-150 |
| Tremie Concrete | 150-200 |
13. Grade of Concrete
Concrete grades indicate compressive strength (IS 456:2000):
| Grade | Strength (N/mm²) | Use |
|---|---|---|
| M10 | 10 | PCC, leveling |
| M15 | 15 | Foundation bedding |
| M20 | 20 | Slabs, beams |
| M25 | 25 | Columns, footings |
| M30 | 30 | Heavy-duty structures |
14. Clear Cover of Main Reinforcement
Clear cover protects reinforcement (IS 456:2000):
| Structure | Clear Cover (mm) |
|---|---|
| Footings |